Net Zero Teesside Takes Major Step Forward as First Engineering Contracts Awarded
Posted on the 15 Dec 2021Net Zero Teesside Power’s carbon capture, utilisation and storage (CCUS) project has hit another major milestone today (15 December) as the first contracts for a design and development competition have been awarded to two engineering consortiums.